Growth needs space

18. June 2021

The groundbreaking ceremony for the new SDG production and assembly hall finally took place on 11th of June at the SDG factory site.

From October 2021, seven modern assembly stations and work areas for preparing components for final mounting will be put into operation on 1,600 square metres. Equipped with two overhead cranes, fully digitalised order management and optimum tooling, a maximum of efficiency will be achieved in the assembly of SDG swap body systems. In the future, the electricity demand for the entire production will be covered by a 100 KWp photovoltaic system in a climate-friendly and CO²-neutral way.

A truck parking area for up to 80 vehicles was already completed in May and ensures the safe parking with comprehensive video and infrared monitoring.

The investments in the SDG location, where over 40 people are employed, create the necessary conditions to keep pace with the rapid development and enable further growth.

Feel free to contact us!